The pentest platform that thinks like a pentester
Hexecution is an AI-native platform built around the test itself: native scan orchestration, smart finding content, AI-assisted review, and one-click reports. 500+ features refined by a working pentest firm on every engagement we deliver. And yes, it runs the business side too, so the spreadsheets and the bolted-on CRM can finally go.
Less a reporting tool than a command center for the whole engagement, and increasingly for the AI agents working alongside your team. If you run a penetration testing firm out of spreadsheets and Word templates, or pay for a platform that was never designed around the test itself, this is the alternative.
The Reality
Most firms run on a patchwork
A reporting tool for deliverables. A CRM for the sales pipeline. Spreadsheets for scoping. Word for templates. A couple of consultants maintaining scripts on the side. Every seam between those tools is a place where things get dropped, re-keyed, or forgotten. And underneath it all, tooling that treats a pentest like a generic document project. We got tired of it, so we built a platform that treats scope, scans, findings, instances, and retests as first-class objects, and then we made it good enough to sell.
Pentest-first, not reporting-first
Built around how a test actually runs. Scope files auto-generated for your tools, scans orchestrated natively (Nmap, Nuclei, Amass, httpx, Dehashed), findings organized by instance and location, retests tracked per location. Not a document tool with a findings table bolted on.
Smart about content
500+ finding templates calibrated across 690+ real assessments, Nessus plugin auto-matching, per-instance CVSS, field inheritance across instances, DOCX round-trip import, and multi-model AI review (Claude, GPT, Gemini, Grok) built into the workflow, not sold as an add-on.
Runs the business side too
Deal pipeline, scoping engine with real hour math, e-signature, invoicing, commissions, and renewals. The parts of running a firm that reporting tools leave in your spreadsheets and CRM come along for free.
Sales to Invoicing
The whole engagement, in one place
Hexecution covers everything from first contact to renewal, but the highlighted steps are where it goes deepest: the test itself. That is the part most platforms treat as a document to format, and the part we obsess over.
Deal Pipeline & Scoping
Kanban pipeline, sublinear pricing engine across 17 assessment types, 3 rate tiers, 7 discount types. Scope a deal in minutes.
Proposal & E-Signature
Interactive proposal portal, real-time pricing, BoldSign SOW signing that auto-advances the deal and spins up the project.
Scope & Scan OrchestrationPentest Core
Define scope once, auto-generate tool-specific scope files, and orchestrate Nmap, Nuclei, Amass, httpx, and Dehashed through production Airflow pipelines. Results merge into the asset inventory automatically.
Findings & Smart ContentPentest Core
500+ curated templates, Nessus plugin auto-matching, per-instance CVSS, field inheritance, structured OWASP/CWE/CVE tags, and multi-model AI quality review before human peer review.
Peer Review & DeliveryPentest Core
Structured 5-question reviews with delivery gating, then DOCX/PDF/CSV/web reports generated in seconds and delivered via secure tokenized links.
Retest, Invoice & Renew
Per-location retest lifecycle, Xero invoicing, commission tracking, and an automated renewal and win-back engine.
See It Running
The same platform we use every day
These are real screens from Hexecution (shown with demo data). Start with the attack surface and the findings workspace where the testing happens, the scan and breach data behind it, then the analytics, scheduling, and pipeline that run the practice around it.
Capabilities
500+ features, built for how firms actually work
Smart Findings Content
- 500+ curated finding templates
- Calibrated against 690+ real assessments
- Nessus plugin ID auto-mapping, built in
- Per-instance CVSS and field inheritance
- Structured OWASP/CWE/CVE/root-cause tags
- Team knowledge that compounds
AI-Assisted Quality
- Multi-model review (Claude, GPT, Gemini, Grok)
- Built in, not a paid add-on
- 0-100 quality score per report
- AI CVSS vector generation
- Severity mismatch detection
- MCP server: drive engagements from an AI agent (Claude Code)
Scan Orchestration & Continuous Testing
- Native scan orchestration via Airflow
- Auto-generated tool-specific scope files
- Scheduled daily/weekly/monthly/quarterly scans
- Asset-change detection between scans
- Unified attack-surface dashboard
- Change alerts routed to Slack
Calibrated Consultant Scorecard
- Size-normalized impact ranking across engagements
- Calibration bias factor (over/under-raters surfaced)
- Per-consultant trajectory over time
- Credits human-directed AI-agent findings
- Transparent 'how impact is calculated' panel
Team & Delivery Ops
- Consultant scheduling Gantt with capacity
- Timesheet tracking with reminders
- Multi-round peer review with delivery gates
- Service coverage tracking across scans
- Full field-level audit changelog
Business Operations
- Deal pipeline with kanban and analytics
- Scoping engine with sublinear hour math
- BoldSign e-signature for SOWs
- Xero invoicing integration
- Commission tracking with referral tiers
- Renewal automation and win-back engine
How it compares
Reporting platforms format the deliverable. Hexecution runs the test that produces it, then handles the practice around it too.
| Capability | Hexecution | Reporting Platforms | Spreadsheets & Word |
|---|---|---|---|
| Native scan orchestration (runs the scans) | — | Manual | |
| Asset-change detection between scans | Partial | — | |
| AI-assisted review, built in (not add-on) | Add-on | — | |
| 500+ curated, calibrated finding library | Partial | — | |
| Per-instance CVSS & structured tags | Partial | Manual | |
| DOCX round-trip import/export | Partial | Manual | |
| Multi-round peer review with gating | Partial | — | |
| Calibrated consultant scorecard | — | — | |
| Interactive client portal with SSO | — | ||
| Deal pipeline, scoping & pricing engine | — | — | |
| E-signature, invoicing & commissions | — | — | |
| Renewal automation & win-back | — | — | |
| Built by a working pentest firm | — | You |
“Reporting Platforms” = dedicated pentest reporting/management tools. “Spreadsheets & Word” = home-baked stacks. Comparison reflects the workflow a firm runs end to end.
Built by a working pentest firm
Every feature exists because we hit the problem running TrustFoundry. Hexecution is not a SaaS company's guess at your workflow. It is the platform we use on every engagement, refined across 690+ assessments. When you ask for something, you are talking to the people who test for a living.
Here for the long run
Hexecution runs on a profitable services business, not venture burn. Early customers get a single-tenant deployment for real data isolation, a direct line to the team, and roadmap input. SOC 2 is on the roadmap, and we provide a security overview and architecture review to design partners today.
Want to run your firm on Hexecution?
We are working with a small number of firms as early customers. If you want a platform that goes deep on the test itself, not just a nicer place to write reports, let us show you how we run every engagement (business side included).